1. Book a free consultation over a call: We provide free consultation service over a phone call, on a pre-fixed date and time, to understand your needs and requirements in a detailed way. This gives us an overall picture of your dream house which you have on your mind.
2. Know us in person: Once the consultation call is over, we can arrange for a face-to-face meeting for better clarity and transparency in dealings and transactions thereafter. This is essential for house construction , building greater trust and rapport between all the parties involved.
3. The project begins: The most important concern of home construction is the feasibility of the project to be undertaken, for which a feasibility report is prepared. In addition, it involves the identification of the project idea/problem, the objectives, and evaluation of possible solutions and their outcomes. Our house construction project manager, then, approve the project which leads to the next phase.
4. The budgeting-planning phase: As per our residential construction norms planning is the most crucial stage as it lays the foundation of any project. The project manager at mane construction goes into a detailed analysis of the resources and materials required, the associated costs, timeframes, the who-when-how pointers, and finally the budget estimates.
5. The Launch phase: This stage gets your project finally going! The previous phase can be referred to as being the launchpad for your project launch. Our house construction entire team keep an eye on the progress, make required adjustments, hold regular meetings, and take necessary steps to ensure that the implementation goes as planned.
6. Performance and Observation phase: This is a vital stage prior to the final one, as this focuses on constant supervision by our house building core team of Architecture, Site Engineer, Purchase Manager, Project Engineer, Interior Architecture so that the project performs well, as per the planned schedule. This step would ensure that the project remains aligned with the company's as well as the client's interests in the long run.
7. Outcome delivery: Finally, we reach the last phase of your dream house project. Unlike other residential construction companies, we are all prepared to deliver the desired outcome to our client after a round of final inspection by the project manager. In addition, this phase requires informing the stakeholders about the closure, ceasing of supplier contracts, etc. Once the client approves, the project is closed.
8. To Become Acquainted: This is a vital stage prior to the final one, as this focuses on constant supervision by our core team so that the project performs well, as per the planned schedule. This step would ensure that the project remains aligned with the company's as well as the client's interests in the long run.
9. Estimation+Budgeting: As per our construction norms it is very important to give you an estimate for the costs which need to be incurred so that you are prepared from the start only. Later our best house contractors in Bangalore try to narrow down the cost to bring it within your budget. And no extra amount will be charged during building or renovating.
10. Here, it all begins: The most important concern of this stage is the feasibility of the project to be undertaken, for which a master plan needs to be developed. Being the best construction company . It is our responsibility to overcome the hurdles and flaws coming in the way. After considering all possible options our project manager then approves getting the construction started.
11. All about the Deliverables: This might be an end line for you but for us, it is the start of something new, something relishing! Finally, we give you the key to unlock your joy. On time, on budget, and on as promised, we give you the outcome after one final round of inspection by our Project Manager. This phase includes informing the stakeholders about the closure, ceasing supplier contracts, etc. For any building construction contractor, once the glimpse of satisfaction can be seen in our client’s eyes, then only the deal is closed. Relish your dream home!
Material That You Can Track
When a material is delivered to the site, time-stamped photographs are uploaded by our Site Manager. You can see these photographs whenever you want. This way you can be assured that the material used is as per the agreement and approved brands/ quality.
Quality That You Can Track
We will provide a dedicated site in charge, to those who are working for those we will be providing a site in charge who is a full-time employees of our group. He applies upto 2000 checks, mostly with time-stamped supporting photographs.
Our clients can see all these checks with supporting photographs on their WhatsApp.
How Does Dream Home Builder Save Your Money?
Will you save money if you were to build the home yourself with the help of an architect? Common sense says Yes! You can hire the contractors and pay them directly. Also, the material can be bought by you at a good price as you are a good negotiator and some friends can also help you with contacts. This way, you think that you can save on the profit that the builder will make.
Reality is completely different. To present an analysis based on numbers, we have done a comparison. As per our analysis, if you were to build an S+4 on 1800 sq. ft. in Delhi-NCR, you would spend appx. Rs. 1300 sq. ft. The same home is built by TECHOBUILD for appx. Rs. 1000 sq. ft. So, you save up to Rs. 300 sq. ft. with Us.
Sample of CLP plan in builder-buyer agreements
Let us assume that the value of the property construction is Rs 50 lakhs.
Particulars of payment (Total | Work Schedule | Amount paid | Total payment |
---|---|---|---|
15% booking amount | Design prep, soil test , site survey & topo drawings, material blocking, Site Marking, cleaning & Foundation work, footing casting & Plinth * A1# | Rs 5 lakhs | Rs 5 lakhs |
25% after * A1# work | Casting of footings , Raising of columns to plinth level, consolidation of soil,casting of plinth beam and completing (M20 or M25) for below flooring within the plinth area, sump top * A2# | Rs 10 lakhs | Rs 15 lakhs |
10% after * A2# work | Construction of brick wall, casting of lintels, chajja * A3# | Rs 5 lakhs | Rs 20 lakhs |
15% after * A3# work | Casting of roof slab with shuttering, tying of steel for roof, electrical conduit laying, Casting of roof slab with shuttering, tying of steel for roof, electrical conduit laying. * A4# | Rs 5 lakhs | Rs 25 lakhs |
7% after * A4# work | External / Internal plastering * A5# | Rs 5 lakhs | Rs 30 lakhs |
7% after * A5# work | Fixing of tiles for bath rooms, Laying of granite or vitrified tiles for flooring in other areas * A6# | Rs 5 lakhs | Rs 35 lakhs |
5% after* A6# | Painting of internal and external wall with putty works for internal walls, exterior emulsion painting, all finishing * A7# | Rs 5 lakhs | Rs 40 lakhs |
7% after* A7# | Plumbing and Electrical works internal with laying of pipes.. * A8# | Rs 7.5 lakhs | Rs 47.5 lakhs |
3% after* A8# | Carpentry works of all doors and windows, Fabrication of railings * A8# | Rs 2.5 lakhs | Total = Rs 50 lakhs |
5% after* A9# | Interior woodwork as per the design * A8# | ||
1% Handover | Final handover |